- Got some slotted steel barstock to use in building the shelf supports for
the computer rack.
- Installed Solaris on Spring.
- Built the shelf supports for the rack.
- Got the Postscript and memory simms for the new printers. The postscript
worked, but the memory was the wrong type.
- Got different memory simms for the new printers. Still didn't work.
Called HP to get the correct part numbers for memory.
- Installed compilers on Spring. Also partitioned additional disks for
data areas.
- Reinstalled Solaris on Spring to increase partition sizes.
- Finished building rack shelves.
- Moved Tejon and Ridge onto the new rack.
- Booted Wwolf on VMS 7.1 and configured network services on it.
- Installed Carizo into the new rack.
- Added additional disks on Spring.
- Installed the FDDI card in Spring and put it on the ring.
- Got the correct printer memory from HP. Set up two-sided printing on the
new printers.
- Talked with CCO about port requirements for the Timers room.
- Set up aset security checking on Spring.
- Installed compilers on the Wwolf VMS 7.1 system.
- Met with Bob and Kate about care and feeding of the online systems while
Bob is away.
- Set up the Laserjet III in Linda's office with the external print server
box.
- Installed the CSLG license renewal on all VMS machines.
***
- Moved the online systems onto the new rack in the telemetry room.
- Set up the new printers for both one and two-sided printing.
- Set up Solaris on Spring.